PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct work raisers at the 2nd floor Facing North.jpg Installed VAV boxes at the 1st floor Facing West.jpg Installing Stair -1 Facing South.jpg Installing waste and vent piping at the 2nd floor bathrooms 1.jpg Installing waste and vent piping at the 2nd floor bathrooms 2.jpg Copper piping-duct work at the 4th floor Facing East.jpg
Previous pageNext page Installing waste and vent piping at the 2nd floor bathrooms 2
Installing waste and vent piping at the 2nd floor bathrooms 2